...
555 28 28 38
Back to projects

#D014

29,170

The cost includes:
1) Roof – coloured tin plate
2) metal-plastic door and window
3) entrance iron door
4) thermal insulation 0.10 cm
5) ხის იატაკი
6) Treatment of walls with protective paint
7) Electricity
8) Water and sewage wiring
9) კონსტრუქვია რკინა
10) შესაფუთი მასალა ხე
Category:
en_US
#!trpst#trp-gettext data-trpgettextoriginal=6545#!trpen#Seraphinite Accelerator#!trpst#/trp-gettext#!trpen##!trpst#trp-gettext data-trpgettextoriginal=6546#!trpen#Optimized by #!trpst#trp-gettext data-trpgettextoriginal=6545#!trpen#Seraphinite Accelerator#!trpst#/trp-gettext#!trpen##!trpst#/trp-gettext#!trpen#
#!trpst#trp-gettext data-trpgettextoriginal=6547#!trpen#Turns on site high speed to be attractive for people and search engines.#!trpst#/trp-gettext#!trpen#